D I L I G E N T
Thumb

Solar Power Plant

a) MW Tata Steel solar power plant inDomjhuri, Jamshedpur

b) Running Project in Chatra for 21MW Solar Power Plant

Scope of  work:The scope of work for a solar power plant project can vary depending on factors such as project size, location, technology used, and specific requirements. However, here is a general outline of the scope of work typically involved in developing a solar power plant:

a)15MW Tata Steel solar power plant inDomjhuri, Jamshedpur

b)Running Project in Chatra for 21MW Solar Power Plant

Scope of  work:The scope of work for a solar power plant project can vary depending on factors such as project size, location, technology used, and specific requirements. However, here is a general outline of the scope of work typically involved in developing a solar power plant:

1.      Project Planning and Feasibility Study:

·         Conducting site surveys to assess solar irradiance, topography, and environmental factors.

·         Analyzing regulatory requirements, permits, and land use agreements.

·         Conducting financial analysis including cost estimation, return on investment (ROI), and payback period.

·         Assessing grid connection feasibility and requirements.

2.      Engineering Design:

·         Designing the solar power plant layout, including the placement of solar panels, inverters, and other equipment.

·         Electrical design, including wiring, transformers, switchgear, and interconnection with the grid.

·         Structural design to ensure the integrity and stability of mounting structures for solar panels.

·         Selection of appropriate solar panel technology and components based on site-specific conditions and project requirements.

3.      Procurement:

·         Procuring solar panels, inverters, mounting structures, cables, transformers, and other necessary equipment.

·         Evaluating and selecting suppliers based on quality, cost, and delivery timelines.

·         Negotiating contracts and agreements with suppliers and subcontractors.

4.      Construction:

·         Site preparation, including clearing land, grading, and installation of access roads.

·         Installation of mounting structures for solar panels.

·         Installation of solar panels, inverters, transformers, and other electrical equipment.

·         Wiring and interconnection of components.

·         Testing and commissioning of the solar power plant.

Operations and Maintenance (O&M):

;